Company 2 Water Supply Drill – Hall Bog - June 23, 2022

Company 2 conducted a water Supply Drill this past week. The Company utilized Tanker 1 and Brush Breaker 29 to shuttle water from a water supply about 3/4 miles away being filled by our Engine 4. Crews from Engine 2 managed to keep a Blitz Fire gun operation during most of the evolution. Not bad with just two pieces of apparatus shuttling water. (Photo’s by Firefighter, Steve Falconer)