Company 3 Hydrant Distribution System Training – Pine Ridge Way Development - September 11, 2021

As a follow-up to the Fire Prevention Program C3 conducted for the residents of the Pine Ridge Condominium Development, Officer/Firefighters of Company 3 spent this past Saturday morning testing the Hydrant Distribution System within the development. Crews drafted water out of the on-premises fire pond, charged the hydrant distribution system, and flowed/flushed the system. This was a great refresher for our new firefighters and to ensure the system is working as designed and can be utilized if another fire were to break out in the development. Great job crews! (Photo’s by Captian Frank Nye)