Company 1 had it’s Water Supply Drill at the “Hummocks” development off Pond Street. Utilizing the Fire Protection Distribution System, which is required in new developments in Carver, Engine 4 fed the system with water drafted from a porta-tank supplied by Tanker 1 and Engine 1 received the water at the other end. (Photo’s by Firefighter Steve Falconer)
Here's what you've missed since the last time you visited our page:
- Jul 13 - Brush Breaker 28
- Jul 12 - Hovercraft
- Jul 12 - Brush Breaker 26
- May 01 - 2024 Recruit Graduation Picture
- Apr 26 - Adam Lauzon