New Engine 1 is currently under construction at the Pierce Manufacturing Facility in Appleton, Wisconsin. Engine 1 will be a Pump and Roll 1,500 gpm Impel Pumper. Features will include a 750 gallon water tank, 20 gallon A/B foam tank, wilburt LED light tower, LED scene lights, two 200′ electric cord reels, top mount master stream, cab operated remote control bumper turret, rear pre-connected Blitz Fire line, rear booster reel, hydraulic ladder rack, front suction, and hydraulic 6kw generator. We expect delivery of all three Engines in late May of 2016.
Here's what you've missed since the last time you visited our page:
- Oct 22 - 2026 Recruit Graduation Picture
- Oct 22 - John Beliveau
- Oct 22 - Car 1 – C1
- Oct 22 - Response Stats 2025
- Oct 22 - Search Images in NextGEN Galleries



























