New Engine 2 is currently under construction at the Pierce Manufacturing Facility in Appleton, Wisconsin. Engine 2 will be a Pump and Roll 1,500 gpm Impel Pumper. Features will include a 750 gallon water tank, 20 gallon A/B foam tank, wilburt LED light tower, LED scene lights, two 200′ electric cord reels, top mount master stream, cab operated remote control bumper turret, rear pre-connected Blitz Fire line, rear booster reel, hydraulic ladder rack, front suction, and hydraulic 6kw generator. We expect delivery of all three Engines in late May of 2016.
Here's what you've missed since the last time you visited our page:
- Feb 28 - Bob Middendorf
- Feb 28 - Steven Maccini
- Jan 19 - Response Stats 2023
- Jan 19 -
- Jan 02 - Robert Telless